Location: Cumnor, Oxfordshire

Type of property: Substantial Grade II Listed period farmhouse undergoing full refurbishment, structural alterations, and new extension additions.

Services used:

  • Surveyor’s Site Inspection & Waterproofing Design.
  • BS8102 & BS8500 Compliant Cavity Drainage System Specification.
  • Substrate Preparation & Mineral Slurry Barrier Application.
  • Cavity Drain Membrane Installation (Walls & Floors).
  • Sump Station Pumping Design & Installation.
  • Battery Backup Power Resilience.
  • Period Feature Conservation Liaison.

Materials Used: 

  • Delta MS500 8 mm Air Gap Wall Membrane.
  • Delta MS20 20 mm Air Gap Floor Membrane.
  • Delta Drainage Channel System.
  • 3x Delta V3 Dual Sump Units with high-level water alarms & control panels.
  • Auxiliary Battery Backup System.
  • Polysil TG500 Sealer.
  • NB1 Waterproofing Slurry.

Problem:

The Farmhouse was scheduled for a comprehensive restoration to bring the historic living areas up to modern habitable standards. Due to the age and nature of the period building, controlling groundwater and hydrostatic moisture ingress was paramount.

 

External works required the reduction of surrounding ground levels alongside a separate pumped land drainage scheme. Internally, a waterproofing system was needed that could protect the building from water ingress while respecting sensitive heritage elements – including protecting existing period fireplaces and carefully lifting and setting aside original period floors for sympathetic reinstatement once the waterproofing works were completed.

Works completed: 

We carried out an on-site inspection and designed a BS8102-compliant Type C internal cavity drainage system. In close coordination with the main contractor, preparatory ground-level, slab rebating, and electrical works were sequenced ahead of installation.

 

Specialist contracted works included:

  • Anti-lime Sealer: Application of Polysil TG500 sealer across the floor slab to bind free salts and prevent calcite leaching.
  • Slurry Underlayment: Application of two coats of KÖSTER NB1 waterproofing slurry to the floor slab.
  • Wall Drainage: Supply and installation of Delta MS500 (8 mm clear stud air-gap) membrane to walls up to a height of 900 mm.
  • Floor Membrane: Installation of heavy-duty Delta MS20 (20 mm air-gap) membrane across the floor, sealed and linked to the perimeter wall membrane.
  • Perimeter Channels: Installation of Delta drainage channels into recessed indents cast into the floor slab.
  • Pumping Stations: Installation of three Delta V3 dual sump units, high-level alarms, and automated control panels housed in dedicated slab pits.
  • Power Outage Protection: Installation of an auxiliary battery backup system to maintain continuous pumping operation during mains electrical failure.
  • Reinstatement Handover: Site cleared and prepared for the contractor’s 60 mm screed overlay, timber dado panelling to walls, and reinstatement of original period flooring.