Location: Weedon Bec, Northamptonshire
Type of property: Brick built former warehouse circa 19th century
Services used:
Materials Used:
Problem: The area concerned was the rear of a former fireplace. Using a conductivity moisture meter, positive readings were recorded on internal wall surfaces rising from skirting board level to ceiling height, and salt contamination was visually identified. This was the result of the combination of one or more of the following:
Works completed: We recommended dry lining the affected section incorporating a vertically applied membrane, this being allowed to vent into the floor void above. We: Supplied and installed Delta System MS500 Membrane from base level to ceiling height. Supplied and installed Delta System Meshed Membrane to ceiling level around the fireplace. Supplied and installed a waterproof wall/floor raglet joint at the membrane base as it abutted the solid construction hearth.